Educator and facilitator sheet
Build the Campus
A free browser game. Players are the construction manager for a data center campus on a made-up Georgia site and see how each choice moves the schedule, budget, crew safety and the neighbors. The game shows facts and trade-offs. It does not take a side on data centers.
- For ages 12 and up
- About 20 minutes per run
- No sign-up, no personal data
- Works offline after the first load
Who it is for
Ages 12 and up (grade 7 to adult); younger players with an adult. Best fit: grades 8–12 career-tech classes, introductory construction management, and adult civic sessions such as library panels on data centers.
Learning goals
After one run, players can:
- Put the nine phases of a construction project in order and explain why some work, like long-lead equipment, sets the pace (the critical path).
- Weigh a choice against schedule, budget, safety and neighbor effects, and say what each option gives up.
- Describe what a data center campus asks of a community (power, water, noise, traffic) and gives back (jobs, tax revenue), using facts rather than sides.
Running it
- Library mode. On the first screen, tick Library mode · no voice. Narration is off, all text stays on screen, and the computer remembers it for the next player.
- Class mode. Add
?mode=classto the game's web address. The game no longer starts over while players talk, and a reload keeps the game in progress. The end screen is the debrief: results against the plan, the three costliest choices and three questions, with a Print button. (Without class mode, an idle game starts over after about three minutes.) - Full screen. Press F11 (Windows, ChromeOS) or Ctrl+Cmd+F (Mac). On a projector, the four-corner map button (presenter view) enlarges the map and text.
- Offline. Open the game once while online and a later reload works without a network. For a kiosk with no network, use the offline kiosk file (link in About).
- Siting. The basins, construction exit, substation, data hall and equipment pads are dragged or tapped onto the map. They snap to a grid and have to stay on the site, behind the setback by the homes, and (for the substation) on the utility corridor. Set it here confirms.
- Setbacks. Some phases draw an issue card for weather, a safety near-miss (nobody is hurt), a late delivery or an inspection. Each answer trades time and money.
Controls
| To | Mouse, trackpad, touch | Keys (map focused) |
|---|---|---|
| Turn and tilt | Drag (when zoomed in: right-drag, Shift-drag or a two-finger twist) | Arrows |
| Zoom | Scroll wheel or pinch | + − |
| Move around the site | When zoomed in, drag (or two fingers) | Shift+arrows |
| Site a piece | Drag or tap the map, then Set it here. Right-drag or two fingers still turn the view. | Arrows nudge, then N |
On-screen camera buttons do the same without dragging: zoom in and out, turn left and right, and Reset view; when zoomed in, four arrow buttons move the view. Elsewhere: Tab moves between buttons, Enter or Space presses, N next step, M map effects on/off, V voice on/off.
Words to know
- Critical path
- the chain of tasks that sets the finish date; a delay on it delays the whole project.
- Long-lead item
- equipment, like a large transformer, that takes months or years to arrive, so it must be ordered early.
- Silt fence and sediment basin
- barriers and ponds that keep muddy rainwater on the site during earthwork.
- MEP
- mechanical, electrical and plumbing: the systems that power, cool and protect the building.
- Switchgear
- large electrical equipment that controls and protects the power feeding the building.
- Commissioning
- testing every system, in levels from factory checks to a planned power cut, before the owner takes over.
- Megawatt (MW)
- a unit of electric power; 100 MW is roughly the electricity of 84,000 homes.
- Buffer and berm
- the space (at least the setback) and earth mounds that screen a site from its neighbors.
Debrief questions
- Which choice cost your project the most? Would you make it again, and why?
- Why does the order of the work matter? What happens when long-lead equipment is ordered late?
- Different communities weigh these trade-offs differently. Which effect matters most where you live, and what facts would you want before deciding?